Per the report, 4 accessibility tests of brighton-hove.gov.uk have been made since August 9, 2019, spanning 1 936 days. The website brighton-hove.gov.uk was confirmed functional 4 times from total checks performed, latest proven on November 22, 2024, by a 200 status response. As of November 26, 2024, brighton-hove.gov.uk showed no instances of downtime during all inspections conducted. As per the received replies, as of November 26, 2024, no errors were found in any of the obtained replies. On November 22, 2024, brighton-hove.gov.uk replied in 0.128 seconds, against its 0.345 seconds average response time.